Firstly, our technicians dismounted, hauled away and recycled old insulation. In addition they installed a new Heat Pump 284ANV024000 according to the building standards so that HVAC-system installation consist of installations of new furnace, new evaporator coil, new outdoor condensing unit and new refrigerant line set. During this project we installed: